Conveyor belt
Rubber-fabric belt BKNL-65, Shore A 60-65
1000 mm belt, up to 500 t/h, sections up to 40 m.
The main conveyor of a line from 250 t/h: feeding the screen from the primary crusher and taking finished fractions to the stockpiles. Rated for continuous two-shift work and lumps up to 350 mm after primary crushing.
Do not take it for a run shorter than 15 metres: the drive pulley, take-up and frame cost more on such a span than the extra width returns - a B800 or a short pan feeder is cheaper. Inclines over 18 degrees and lumps over 350 mm are as wrong for it as for the B800: belt width removes neither limit.
| Belt width | 1000 mm |
|---|---|
| Capacity | 120-500 t/h |
| Section length | 12-40 m |
| Max incline | 18 degrees |
| Motor power | 22-30 kW |
Rubber-fabric belt BKNL-65, Shore A 60-65
Machines held in our Oskemen warehouse ship within a week. Items made to order leave the factory in 8 to 12 weeks, plus transport to your site. We give an exact date once the specification is agreed: before that, any figure is a guess.
We report a delay on the day it becomes known, not on the shipping date, and send a new date with the reason. If the delay is our fault, the contract provides a penalty and we pay it. If the factory or customs moved the date, we show the documents instead of silently passing the wait on to you.
The material and its strength, the feed size, the required product fraction, the capacity in tonnes per hour and the operating schedule. These five points are enough to offer two or three options. Without them, selection turns into selling whatever is in stock.
The 12 month warranty covers manufacturing and assembly defects: frame cracks, bearing assemblies, drives, electrics. It does not cover wear parts such as plates, liners and blow bars, nor damage from running outside the rated duty: overload, uncalibrated feed, tramp metal. We explain that line before signing, not after a breakdown.
A defect is a fault of material or manufacture: a cavity in the casting, an unfused weld, hardness below the declared steel grade. Wear is even consumption of the working surface over service hours. A dispute is settled by measurement and dated photographs, and by a sample analysis if needed. Until the cause is established we neither refuse nor agree in advance.
Wear parts for the common models are in stock and ship the same day. Items made to order take 3 to 6 weeks from the factory. We quote availability from the actual stock balance, not from a catalogue: if a part is not there we say so at once and offer an equivalent or a date.